Files
silo-server/docs
RXWatcherandClaude Opus 4.7 f967fad9ff docs(audiobooks): ABS Phase 0 implementation plan
Step-by-step TDD plan for the login + critical-bug-fix phase. Eleven
tasks, each with file:line targets, complete code blocks, test code,
and exact verification commands. Lands diagnostic logging, login/
authorize envelope enrichment, author/series ID surfacing, filterdata
hydration, resume-position wire-up, POST /auth/refresh, and POST /logout.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-26 06:44:32 +02:00
..
2026-05-22 23:26:56 -04:00
2026-05-22 23:26:56 -04:00
2026-05-22 23:26:56 -04:00
2026-05-22 23:26:56 -04:00